| Name | MAROON |
|---|---|
| Secondary Dam | No |
| Main Dam | |
| Reservoir Name | MAROON |
| Purposes | I - irrigation |
| Owner/Operator Name | SunWater |
| Consultant Name | Water Resources Commission & Gutteridge,Haskins & Davey Pty Ltd |
| Contractor Name | Water Resources Commission |
| Comment One | |
| Comment Two | |
| URL | https://en.wikipedia.org/wiki/Maroon_Dam |
| PSP | |
| Electrical Power (MW) | |
| Mean Annual Energy (GWh) | |
| Resettlement | 10 |
| Alternative Name | |
| National Code | |
| Dam Code | I00900321 |
| Nb References ICOLD | 1 |
| References ICOLD | M. BARKER, I. LONIE (2015). USE OF RISK ANALYSIS FOR FLOOD UPGRADE DESIGN AND CONSTRUCTION RISK / UTILISATION DE L'ANALYSE DES RISQUES POUR LA CONCEPTION DE LA PRÉVENTION DU RISQUE DE CRUE ET DU RISQUE DE CONSTRUCTION. 25th Congress of ICOLD-CIGB. Stavanger, Norway. CRC Press |
| Reserved Committee O |
| Continent | AUSTRAL-ASIA |
| Country Name | Australia |
| French Country Name | |
| International | |
| River | Burnett Ck |
| City | Boonah |
| State | Queensland |
| Longitude | 152.656875 |
| Latitude | -28.181227 |
| Zone ISO 3166 | AU |
| Built | 1973 |
| Particular | |
| Dam Type | TE |
| Sealing | ie |
| Foundation | R |
| Height (m) | 46.0 |
| Length (m) | 451.0 |
| Spillway Capacity (m³/s) | 567.0 |
| Spillway Type | L |
| Detailed Type of Dam | |
| Elevation (m) | 207 / 202 [e] |
| Volume Dam (1,000m³) | 1620 |
| Reservoir Volume (1,000m³) | 44300 |
| Reservoir Area (1,000m²) | 3100 |
| Reservoir Length (km) | |
| Catchment (km²) | 160.0 |
| Irrigated Area (km²) | 40.0 |
| Flood Protect (% of reservoir volume) | 224 |
| Sedimentation | |
| Reservoir Code | R00900321 |
| Reservoir ISO 3166 | AU |
No images available.