| Name | MERRIMU |
|---|---|
| Secondary Dam | No |
| Main Dam | |
| Reservoir Name | MERRIMU |
| Purposes | I - irrigation,S - water supply |
| Owner/Operator Name | Southern Rural Water |
| Consultant Name | State Rivers & Water Supply Commission, Victoria |
| Contractor Name | State Rivers & Water Supply Commission, Victoria |
| Comment One | |
| Comment Two | |
| URL | |
| PSP | |
| Electrical Power (MW) | |
| Mean Annual Energy (GWh) | |
| Resettlement |
| Alternative Name | |
| National Code | |
| Dam Code | I00900272 |
| Nb References ICOLD | 1 |
| References ICOLD | Siraj PERERA, Tusitha KARUNARATNE (2022). CLIMATE CHANGE CHALLENGES IN MANAGING DAMS / Défis liés au changement climatique dans la gestion des barrages. 27th Congress of ICOLD-CIGB. Marseille, France. CRC Press |
| Reserved Committee O |
| Continent | AUSTRAL-ASIA |
| Country Name | Australia |
| French Country Name | |
| International | |
| River | Coimadai Ck |
| City | Bacchus Marsh |
| State | Victoria |
| Longitude | 144.494623 |
| Latitude | -37.633428 |
| Zone ISO 3166 | AU |
| Built | 1969 |
| Particular | R |
| Dam Type | ER |
| Sealing | ie |
| Foundation | R |
| Height (m) | 46.0 |
| Length (m) | 400.0 |
| Spillway Capacity (m³/s) | 230.0 |
| Spillway Type | L/V |
| Detailed Type of Dam | ECED - embankment dam with a clay central core |
| Elevation (m) | 164 / 170 [e] |
| Volume Dam (1,000m³) | 32516 |
| Reservoir Volume (1,000m³) | 32516 |
| Reservoir Area (1,000m²) | |
| Reservoir Length (km) | |
| Catchment (km²) | 85.0 |
| Irrigated Area (km²) | 7.0 |
| Flood Protect (% of reservoir volume) | |
| Sedimentation | 7.1 |
| Reservoir Code | R00900272 |
| Reservoir ISO 3166 | AU |