| Name | TALBINGO |
|---|---|
| Secondary Dam | No |
| Main Dam | |
| Reservoir Name | TALBINGO |
| Purposes | H - hydroelectric |
| Owner/Operator Name | Snowy Mountains Hydro-Electric Authority |
| Consultant Name | Snowy Mountains Hydro-Electric Authority |
| Contractor Name | Thiess Bros Pty Ltd |
| Comment One | |
| Comment Two | |
| URL | https://en.wikipedia.org/wiki/Talbingo_Dam |
| PSP | TUMUT 3 UPPER |
| Electrical Power (MW) | |
| Mean Annual Energy (GWh) | |
| Resettlement |
| Alternative Name | TUMUT 3 |
| National Code | |
| Dam Code | I00900294 |
| Nb References ICOLD | 2 |
| References ICOLD | R. Herweynen, N. West (2024). The importance of pumped hydro in Australia's energy transition. Symposium ICOLD-CIGB: Dams for People, Water, Environment and Development/Des barrages pour les hommes, l'eau, l'environnement et le développement. New Delhi, India|Andrew Wilson (2025). Repurposing of dams and mine sites for pumped hydro projects in Australia. Symposium ICOLD-CIGB: Common Challenges, Shared Future, Better Dams/Défis communs, avenir partagé, meilleurs barrages. Chengdu, China |
| Reserved Committee O |
| Continent | AUSTRAL-ASIA |
| Country Name | Australia |
| French Country Name | |
| International | |
| River | Tumut |
| City | Tumut |
| State | New South Wales |
| Longitude | 148.303585 |
| Latitude | -35.624791 |
| Zone ISO 3166 | AU |
| Built | 1971 |
| Particular | |
| Dam Type | ER |
| Sealing | |
| Foundation | |
| Height (m) | 162.0 |
| Length (m) | 701.0 |
| Spillway Capacity (m³/s) | 4290.0 |
| Spillway Type | L |
| Detailed Type of Dam | |
| Elevation (m) | 546 / 538 [e] |
| Volume Dam (1,000m³) | 14490 |
| Reservoir Volume (1,000m³) | 921400 |
| Reservoir Area (1,000m²) | 19355 |
| Reservoir Length (km) | |
| Catchment (km²) | 1093.0 |
| Irrigated Area (km²) | |
| Flood Protect (% of reservoir volume) | |
| Sedimentation | |
| Reservoir Code | R00900294 |
| Reservoir ISO 3166 | AU |
No images available.